← Back to P6 RFP overview
3. General design and manufacturing (RFP scope)
This section is to be completed. Applies across all subsystems.
Scope
- Material — for every component
- Manufacturing method — per part
- Fasteners — full selection and assembly process
- Tolerancing — between components; agree with manufacturers how to achieve
- Post-processing — to achieve tolerances
- CAD: Currently Inventor → switching to SolidWorks
Status
Material and method TBD per subsystem; fastener list and tolerance strategy TBD.